Distributed generation PV mounting system application

May 23, 2016

Distributed PV system can be installed in any sunlit place, including the ground, at the top of the building, side elevational, balcony, including in schools, hospitals, shopping malls, villas, residential, factories, enterprises and roof, carport, Gongjiaozhanpai top most widely used. From the perspective of security and stability, to consider the design permanent load, wind load, snow load, temperature load on the photovoltaic array and buildings, to ensure the PV modules.

Before installation of a distributed system, the load capacity of the building to carry out the investigation, calculating and checking to ensure that the buildings meet the load under the premise of a reasonable design to installation. PV mounting the battery pack under certain if the visit is also to generate electricity, but due to continuous rain or fog and haze, the sun is low irradiance, PV mounting system if it is not the operating voltage of the inverter start-up voltage, the system it will not work. Distributed grid photovoltaic power generation system and distribution network are running in parallel, when the PV system can not meet the load demand or due to a cloudy day without work, the electricity grid will automatically replenish over, there is no lack of electricity and power outages, which Pay particular attention to the point.